Four Winds Construction Update June 2014

Greetings!

With the following, we present to you the latest update and information from our "Intelligently Beautiful Design" as well as our building progress as of June 2014. The details of this are as follows:

  • Ground anchor work for wall reinforcements and soil retention, done through tying down soil retention walls or nailing it to the ground in order for the walls to remain safe as excavation is underway as well as work on waler beam.
  • Work on Dewatering and Observation Well continues to progress.
  • Structural work on the ground water tank as a reservoir for water from PAM and water supply in the event of a fire.
  • Structural work on turap soil retentions on the landscape area is still in progress.
  • Structural work on the raft foundation is still in progress.
  • Structural work for the basement 2 is still in progress.
  • Structural work for the retention walls in basement 2 up to basement 1 continues to progress.
  • Structural work on the columns and shear wall of basement 2 up to basement 1 is continues to progress.

Moreover, we would also like to convey the building progress of out marketing gallery, located in close proximity of Four Winds of Senayan. The details are as follows:

  • The Roof and air conditionings have been installed.
  • Assembly and installation of marble for the flooring and walls continues to progress.
  • Elevator installations are still underway.

If you have any questions in relation to your apartment purchase at Four Winds of Senayan, please feel free to contact us at +62 21 9197 0077 and +62 21 9197 0088 or email us at info@fourwinds.co.id




Sincerely yours,


Derijanto Gani
Project Director